Lewes Forum thread

Go on, tell 'em what you think


Lewes Forum New message

A27

1
1
On 1 Dec 2014 at 9:04am rail user wrote:
It has been announced that £350m are to be spent on improving the A27. Just as the climate talks in Lima get under way. Not what Norman wanted I suspect.
3
 
On 1 Dec 2014 at 12:20pm Earl of Lewes wrote:
It would be a shame to do anything that increased the volume of traffic - the A27 is noisy enough. But I'd like to see the flow of traffic improved with some overtaking lanes, so that a tractor or OAP can't create long tailbacks when they amble along at 30mph. This would remove the need to perform dangerous overtaking manoeuvres and improve safety.
1
1
On 1 Dec 2014 at 5:40pm Lima Schima wrote:
Getta Life
4
2
On 1 Dec 2014 at 5:53pm plumber wrote:
£350million composed of the following:

2015 - £75million study into which areas need to be widened.
2020- £75m study into how best to keep traffic moving why roadworks take place
2025 - £75m study into environmental impact and how to minimise disruption to environment.
2030 - £75m spent on frog and small mammal tunnels requiring drainage to areas surrounding tunnels.
2035 - £50m spent on emergency road repairs after 20yrs of neglect.


33 posts left

Your response


You must now log in (or register) to post
Click here to add a link »
Smile
Smile Wink Sad Confused Kiss Favourite Fishing Devil Cool

terms


 

Cliffe Tableau 2015 24:132
Cliffe Tableau 2015

The government acts for private ne'er-do-goods who do very well financially, by endorsing their massive scams for a cut in the... more
QUOTE OF THE MOMENT
If freedom of speech is taken away, then dumb and silent we may be led, like sheep to the slaughter.
George Washington
Brighton Jobs